OCGT and Reciprocating Engines (Fuel Type - Gas)

17 unique locations (643 components)

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
β€’ Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
β€’ A gas engine CHP site providing hot water to a local district heating network
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ One CHP engine in a horticultural environment with no auxilliary load.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
SynTech Energy Centre Ltd Portway Road Wednesbury WS10 7DZ West Midlands (3 components)
β€’ CHP at a water treatment works in Glasgow.
β€’ Deutz Gas Engine Dual fuel SynGas / Mains Gas
Active β€’ 2025-26 (T-4), 2018-19 (T-1)
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
β€’ Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Saltend Lane, HULL, HU12 8PP (33 components)
β€’ Load reduction
β€’ Load reduction on site
β€’ On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
β€’ 1 x hydro turbine & synchronous generator
β€’ 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
β€’ one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
β€’ Battery energy storage unit
β€’ CHP at a horticultural environment.
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
β€’ A Battery Energy Storage System.
β€’ Combined Heat and Power Plant Olympic Park London
β€’ Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
β€’ Genset 2.
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
β€’ West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
β€’ A 7.5MW Tesla Battery Energy Storage System
β€’ Killingholme Module 1 converted to open cycle operation
β€’ Killingholme Module 2 converted to open cycle operation
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
β€’ CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
β€’ The CMU component is a combined cycle gas turbine
β€’ one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
β€’ Hamms Hall - Existing Site CHP
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ existing CHP on site
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
β€’ CHP unit
β€’ Load reduction.
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
β€’ Gas CHP engines in commercial horticultural usage with no auxilliary load
β€’ Load reduction
β€’ N/A
Active β€’ 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
β€’ 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
β€’ New build transmission connected battery storage site
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
β€’ 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
β€’ A completed power plant, with associated civil works, switchgear and electrical connection.
β€’ Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
7.90 MW
Loading map...
Showing 17 locations