OCGT and Reciprocating Engines (Fuel Type - Gas)
265 unique locations (1347 components) - Page 1 of 11
Yard adjacent to Manchester Road, Westhoughton BL5 3QH (1 component)
Gas fired generating units
Wordsworth Crushing Limited, Whaley Road, Barugh, Barnsley S75 1FJ (1 component)
The CMU Component will be made up of gas fired engines.
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
Woburn Road, Bedford, MK43 9AH See attached location note (1 component)
Gas fired reciprocating engines.
Wincham Lane, Wincham, Northwich CW9 6DE (8 components)
Willow Holme Road, Carlisle, CA2 5RN (1 component)
Gas fired reciprocating engines
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RR (11 components)
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (7 components)
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (27 components)
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (13 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Watling Rd, Bishop Auckland DL14 9AS (4 components)
New build power station comprised of multiple reciprocating engines.
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
Water Orton, Birmingham, B46 1NU See attached location note (3 components)
Gas fired reciprocating engines.
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (26 components)
Walton Road, Burton Upon Trent, DE15 9NG (8 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Venture Road, Fleetwood, Blackpool, FY7 8RS (4 components)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW (3 components)
Vacant Land off Station Rd, Nursling, Southampton SO16 0YD, UK (1 component)
16MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Vacant land off Middleton Road, Morecambe, Lancaster, LA3 3NT (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Vacant land off Middleton Road, Morecambe Lancaster, LA3 3NT (2 components)
15.5 MW power plant comprising 8 gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Vacant land off Middleton Road, Morecambe, Lancashire, LA3 3NT (2 components)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Vacant Land, Griffiths Road, Lostock Gralam, Northwich CW9 7ZR (3 components)
20 MW power plant comprising 10 x 2MW gas reciprocating engines. The power plant will be connected to the local electricity distribution network and local gas network.
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
A new 299MW Open Cycle Gas Turbine peaking plant
Unit J1 Aven Industrial Park, Tickhill Road, Maltby, Rotherham, S66 7QR (5 components)
Gas fired generating sets
Unit H, Lyon Road, Bletchley, Milton Keynes MK1 1EX (4 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.