OCGT and Reciprocating Engines (Fuel Type - Gas)

6 unique locations (55 components)

Unit D, Kendale Rd, Scunthorpe DN16 1DT (20 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Meadowfield Industrial Estate, Meadowfield, Durham, DH7 8RL (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at the corner of Hull Road and Salt End Lane, HU12 8PP (5 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
46.54 MW
Gavel Way, Gloucester GL1 2DS (5 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (7 components)
• 10 MW power plant comprising 5 x 2MW gas fired reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.31 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-4) ...
9.16 MW