Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

8 unique locations (89 components)

The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Mannerberg Way, Scunthorpe, East Yorkshire, DN15 8XF (6 components)
• 20 MW power plant comprising 8 x 2.5MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• Gas generators
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
41.27 MW
HC ESS4 LIMITED, RED SCAR BUSINESS PARK, LONGRIDGE ROAD, LONGRIDGE, PRESTON, LANCASHIRE, PR2 5NJ (9 components)
• 19MW of DSR
• Gas Reciprocating
• gas generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Golborne Energy Park, Off Kid Glove Road, Golborne, Warrington WA3 3DP (2 components)
• Aggregate CMU from multiple sources
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (15 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.90 MW
Loading map...
Showing 8 locations