OCGT and Reciprocating Engines (Fuel Type - Gas)

9 unique locations (89 components)

Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (7 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
55.09 MW
RWE Ferrybridge A Workshops Old North Road Ferrybridge Knottingley WF11 8NG (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2021-22 (T-4)
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
19.26 MW
RWE Cogen UK Limited (formerly know as Bridgewater Paper CHP) North Road Ellesmere Port South Wirral CH65 1AF (2 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• One (1) Open Cycle Gas Turbine
Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
41.27 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Grimsby Power Station Moody Lane Grimsby DN31 2SW (6 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2024-25 (T-4), 2023-24 (T-4) ...
38.08 MW
Loading map...
Showing 9 locations