Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

10 unique locations (69 components)

Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0BH (7 components)
• Gas fired generating units
• Gas reciprocating engines
• N/A
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (15 components)
• Gas turbine generator
• Keadby 1 CCGT
• Keadby GT3
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
230.64 MW
Iwmf, Padworth Lane, Paworth Sidings, Lower Padworth, West Berkshire, RG7 4HY (10 components)
• EV charging on residential premises
• Gas reciprocating engines
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Houghton Main CMU Generation Plant, Park Spring Road, S Grimethorpe, S72 0HN (8 components)
• Gas reciprocating engines
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.04 MW
Hem Heath CMM Generation, Sir Stanley Mathews Way, Trentham Lakes, Trentham, Stoke on Trent ST4 4DD (6 components)
• Energy From Waste facility
• Gas reciprocating engines
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Former Brodsworth Main Colliery, Long Lands Lane, Brodsworth, Doncaster, DN5 7XB (7 components)
• Battery Storage
• Gas fired CHP unit
• Gas fired generating engines
Active • 2026-27 (T-4), 2021-22 (T-4) ...
6.36 MW
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)
• Gas fired generating units
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.50 MW
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating units
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Loading map...
Showing 10 locations