Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

11 unique locations (80 components)

TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (5 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (6 components)
• 3.6MW of demand reduction
• Gas generating unit(s)
• NEW BUILD GAS GENERATION STATION
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Pierces Farm PV Palmers Lane Near Grazeley Burghfield Reading RG7 3AH (3 components)
• 0.25MW of demand reduction
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate, to export.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
41.27 MW
HC ESS4 LIMITED, RED SCAR BUSINESS PARK, LONGRIDGE ROAD, LONGRIDGE, PRESTON, LANCASHIRE, PR2 5NJ (9 components)
• 19MW of DSR
• Gas Reciprocating
• gas generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fitzwise Yard Troughbrook Road Hollingwood CHESTERFIELD S43 2JP (3 components)
• 4MW of demand reduction
• CHPs at Queen Elizabeth Hospital
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2021-22 (T-4)
"Butchersfield Landfill Site, Rixton Old Hall, Manchester Road, Rixton, WARRINGTON, WA3 6EW" (5 components)
• 2 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (9 components)
• A New Build 14MW Gas Fuelled Generating Station.
• Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.24 MW
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
• 1 MW CHP generation
• 30MW/30MWh one hour battery storage asset located near BURWB1 asset
• Siemens SGT200 based CHP
Active • 2026-27 (T-4), 2024-25 (T-4) ...
5.34 MW
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)
• 0.27MW of demand reduction
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
Inactive • 2021-22 (T-4), 2019-20 (T-1)
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
• 14.710 MW CHP generation
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
Loading map...
Showing 11 locations