OCGT and Reciprocating Engines (Fuel Type - Gas)

19 unique locations (198 components)

REDWITHER ROAD, WREXHAM, INDUSTRIAL ESTATE, WREXHAM, LL13 9RD (5 components)
• A new build 5MW gas fuelled generating station.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Plot B2, Lords Wood Road, Harworth, DN11 8RY. (2 components)
• A 12MW new build gas fuelled generating station.
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2021-22 (T-4)
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (8 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas turbine
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Multi-Tech Engineering (UK) Ltd, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire, WF11 8RD (4 components)
• A 20MW new build gas generating station..
• DSR Component providing load turn down at a retail store
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (9 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Storage Plant
• Single Shaft CCGT (Module 2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Former Brodsworth Main Colliery, Long Lands Lane, Brodsworth, Doncaster, DN5 7XB (7 components)
• Battery Storage
• Gas fired CHP unit
• Gas fired generating engines
Active • 2026-27 (T-4), 2021-22 (T-4) ...
6.36 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
Caister STW 2, CAISTER-PUMP LANE STW - HV, Pump Lane, off Caister by pass Caister On Sea, GREAT YARMOUTH Norfolk, NR30 5AJ (8 components)
• New build power station comprised of multiple reciprocating engines.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Cadney Carrs WPS 1, CADNEY CARRS WPS, Brigg Road, Cadney, BRIGG South Humberside, DN20 9HP, (7 components)
• A New Build 8MW Gas Fuelled Generating Station.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
123.20 MW
Bicker Bar, Swineshead, Boston, Lincolnshire, PE20 3AN (5 components)
• A New Build 8MW Gas Fuelled Generating Station.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)
• Gas fired generating units
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.50 MW
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (9 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
• Existing OCGT
• New build power station comprised of multiple reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
83.72 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Loading map...
Showing 19 locations