45 unique locations (310 components) - Page 1 of 2

Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• 1 x jenbacher j616
• Gas reciprocating engine
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RR (5 components)
• 1 x jenbacher j616
• Gas reciprocating engine
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (4 components)
• 2x Jenbacher J620 & 1x Jenbacher J616
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Warsop Energy Park Carter Lane, Warsop Vale, NG20 8XG (9 components)
• 1 x MWM TCG 1.35MW
• Gas fired generating units
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Unit D, Kendale Rd, Scunthorpe DN16 1DT (17 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit 19 Lowther Road Clay Flatts Industrial Estate Workington CA14 2TQ (4 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New build gas generator
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (6 components)
• Gas fire generating unit
• One CHP engine in a horticultural environment with no auxilliary load.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (5 components)
• 1 x MWM TGC 2020
• Gas fire generating unit
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FT (5 components)
• 1 x MWM TBG 620V 16K
• Gas reciprocating engine
• Unit 3 at Saltend Power Station
Inactive • 2021-22 (T-4), 2017-18 (T-1)
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FT (4 components)
• 1 x MWM TBG 620V 16K
• Gas reciprocating engine
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (6 components)
• 1x MWM TCG 2020
• Gas fired generating unit
• The CMU component is an aggregation of turn-down and onsite generation
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (5 components)
• 1x MWM TCG 2020
• Gas fired generating unit
• Gas reciprocating engine
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Sully Moors Industrial Estate, Barry, South Wales, CF64 5RP (13 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
15.13 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (9 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• Gas reciprocating engines.
• Natural Gas fired CHP unit at Halton General Hospital, Hospital Way, Runcorn, Cheshire WA7 2DA
Active • 2028-29 (T-4), 2024-25 (T-4) ...
1.18 MW
RWE Cogen UK Ltd North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
• Conoco Phillips CCGT - Private Network connected to Conoco Phillips Refinery - Auxiliary load behind CMU meter
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
19.26 MW
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Portman House, Richmond Hill, Bournemouth, Dorset BH2 6EP (2 components)
• Load curtailment and standby generation
• New build power station comprised of multiple reciprocating engines.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Old Mill Industrial Estate, Mansfield, NG19 9BG (10 components)
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Manchester, Bolton & Bury Canal Towpath, Clifton, Manchester M27 8LR (7 components)
• Gas fired reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• gas fired reciprocating engines
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
M65, Accrington BB5 5WE (8 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
19.60 MW
Lord?s Way Basildon SS13 1DB (4 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (7 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Kingsnorth Works Industrial Estate, Hoo, Rochester Kent ME3 9ND (5 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Kingsmoor Power Limited Plot 3 Duchess Avenue Carlisle CA6 4SJ (4 components)
• New Build 7.070MW gas-fired power station comprised of up to 7 reciprocating engines
• New build 7.070MW gas-fired power station comprised of up to 7 reciprocating engines.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Kingsmoor Power Limited Plot 3 Duchess Avenue Carlisle CA6 4SJ (4 components)
• New Build 7.070MW gas-fired power station comprised of up to 7 reciprocating engines
• New build 7.070MW gas-fired power station comprised of up to 7 reciprocating engines.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Loading map...
Showing 25 locations