Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Hydro

5 unique locations (100 components)

SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
20.96 MW
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (4 components)
• 1 x hydro turbine & synchronous generator
• Gas fired reciprocating engines.
• The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from Anaerobic Digestion (AD) biogas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The four components of the CMU (referenced VIR097, VIR098, VIR099 and VIR100) are MWM 2020 V12 units (VIR 097 is a MWM 2020 V16), built in 2011 and rated at 1,200kW (VIR097 is rated at 1,560kW). Each engine generates at 415V, which is then stepped up to 6.6kV for export.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
17.00 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 5 locations