Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

23 unique locations (290 components)

Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)

On-site CHP - existing generating unit

Active • 2025-26 (T-1), 2025-26 (T-4) ...
65.89 MW
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (12 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
95.63 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (12 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
153.69 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (15 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
160.67 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (18 components)

Energy from Waste Recovery Facility

Active • 2022-23 (T-3), 2022-23 (T-4) ...
201.60 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (19 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
64.60 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (21 components)
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2025-26 (T-4), 2026-27 (T-4) ...
190.72 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (32 components)
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
126.36 MW
Lakeside EFW, Lakeside Road, Colnbrook, SL3 0FE (12 components)
• Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 36 MW to the distribution network.
• Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network.
• Energy From Waste plant located in Colnbrook.
Active • 2023-24 (T-1), 2024-25 (T-4) ...
225.79 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (26 components)

Existing Energy from Waste Plant

Active • 2024-25 (T-4), 2025-26 (T-4) ...
65.23 MW
Indaver Rivenhall IWMF, Woodhouse Lane, Essex, CO5 9DF (2 components)

New Build Energy from waste facility

Active • 2028-29 (T-4)
87.85 MW
Indaver Rivenhall IWMF, Woodhouse Lane, Essex CO5 9DF (2 components)

New Build Energy form Waste facility.

Active • 2028-29 (T-4)
48.42 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (4 components)
• Energy from Waste facility
• Energy from Waste facility.
Active • 2023-24 (T-4), 2028-29 (T-4)
50.90 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (10 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2024-25 (T-4), 2025-26 (T-4) ...
71.95 MW
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (7 components)

Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
93.09 MW
enfinium Skelton Grange Limited South Road Knowsthorpe Leeds LS10 1RR (3 components)

SG is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2025-26 (T-1), 2027-28 (T-4)
86.46 MW
enfinium Ferrybridge 2 Limited Kirkhaw Lane, off Stranglands Lane Knottingley West Yorkshire WF11 8DX (3 components)

FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network

Active • 2027-28 (T-4), 2028-29 (T-4)
67.78 MW
enfinium Ferrybridge 1 Limited Kirkhaw Lane off Stranglands Lane Knottingley West Yorkshire WF11 8DX (3 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2027-28 (T-4), 2028-29 (T-4)
139.48 MW
EcoPark, Advent Way, Edmonton, London N18 3AG (20 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2021-22 (T-4), 2022-23 (T-3) ...
17.61 MW
Binn EcoPark Glenfarg Perth Scotland PH2 9PX (1 component)

New Build Municipal waste incineration plant located in Perthshire, Scotland. It is based on one boiler supplying steam to a single turbine-generator. The CMU is connected to the Distribution Network

Active • 2028-29 (T-4)
6.87 MW
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (7 components)

Energy from Waste plant fuelled by biomass

Active • 2023-24 (T-1), 2024-25 (T-4) ...
36.95 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
14.36 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (20 components)
• NB MPAN 1900070394446 -1900070467983. Allington Integrated Waste Management Facility Laverstoke Road 20-20 Business Park Maidstone Kent ME16 0LE. The auxiliary load is not included in the connection capacity i.e. The export is net.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
164.37 MW
Loading map...
Showing 23 locations