Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

2 unique locations (10 components)

Active MW: 3547.00 MW
Inactive MW: 26.81 MW
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)

An energy from waste facility located in North Wales and designed to generate electricity (3)

Energy from Waste ENFINIUM PARC ADFER LIMITED Parc Adfer Parc Adfer +5 more CH5
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
46.26 MW
ENFINIUM PARC ADFER LIMITED, Weighbridge Road, Deeside Industrial Estate, Zone4, Deeside, Flintshire, CH5 2GY (1 component)

An Energy from Waste Facility located in North Wales and designed to generate electricity

Active β€’ 2029-30
16.46 MW
Loading map...
Showing 2 locations