Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

12 unique locations (44 components)

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components) Geocoding Needed

Energy Recovery Facility burning waste (3)

Energy from Waste WESTFIELD ENERGY RECOVERY LIMITED New Build Generating CMU Westfield EfW Westfield EfW +1 more
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (4 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement) (2)
• 2 stream municipal waste incinerator
Coal/biomass Energy from Waste HANFORD WASTE SERVICES LIMITED Existing Generating CMU Stoke Incinerator Stoke Incinerator +1 more ST4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Plot 8 Protos Grinsome Road Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will … (2)

Energy from Waste PROTOS ERF LIMITED New Build Generating CMU PROTOS ERF PROTOS ERF CH2
Active • 2024-25 (T-4), 2023-24 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

Coal/biomass Energy from Waste HOOTON BIO POWER LIMITED New Build Generating CMU Hooton Bio Power Limited Hooton Bio Power Limited +1 more Not Prequalified CH65
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility (2)

Coal/biomass Energy from Waste Cardiff Bio Power Limited New Build Generating CMU Cardiff Bio Power Limited Mor Hafren Bio Power Limited 1 Not Prequalified CF3
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Newhurst Quarry, Ashby Road East, Shepshed, Leicestershire, LE12 9BU (2 components)

An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist … (2)

Energy from Waste NEWHURST ERF LIMITED New Build Generating CMU Newhurst EfW Newhurst EfW LE12
Inactive • 2023-24 (T-4), 2022-23 (T-4)
Ferrybridge MFE Limited Kirkhaw Lane Off Stranglands Lane Knottingley West Yorkshire WF11 8DX (5 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (3)

Coal/biomass Energy from Waste ENFINIUM FERRYBRIDGE 1 LIMITED Existing Generating CMU FM1 FM1 +2 more WF11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (10 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines. (3)

Coal/biomass Energy from Waste LONDONENERGY LTD Existing Generating CMU LondonWaste LondonWaste +4 more N18
Active • 2025-26 (T-1), 2024-25 (T-4) ...
17.61 MW
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility (3)

Coal/biomass Energy from Waste North Lanarkshire Bio Power Limited New Build Generating CMU North Lanarkshire Bio Power Limited North Lanarkshire Bio Power Limited +1 more Not Prequalified ML5
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bolton Thermal Recovery Facility Raikes Lane Industrial Estate Bolton Greater Manchester BL3 2NP (2 components)

New Build Energy from Waste Plant (2)

Energy from Waste SUEZ RECYCLING AND RECOVERY UK LTD New Build Generating CMU Bolton TRF BL3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth. (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
Energy from Waste VIRIDOR ENERGY LIMITED New Build Generating CMU Avonmouth ERF Avonmouth ERF +2 more BS11
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
342 Edinburgh Avenue, Slough, SL1 4TU (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 33kV (2)

Energy from Waste SSE SLOUGH MULTIFUEL LIMITED New Build Generating CMU Slough Multifuel Slough Multifuel SL1
Active • 2024-25 (T-4), 2023-24 (T-4)
Loading map...
Showing 12 locations