Energy from Waste

17 unique locations (50 components)

Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a … (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Beddington ERF, 105 Beddington Lane, Croydon, CR0 4TE (1 component)

Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.

Inactive • 2019-20 (T-1)
Bolton Thermal Recovery Facility Raikes Lane Industrial Estate Bolton Greater Manchester BL3 2NP (2 components)

New Build Energy from Waste Plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (2 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in …
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Ferrybridge MFE Limited Kirkhaw Lane Off Stranglands Lane Knottingley West Yorkshire WF11 8DX (2 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Four Ashes ERF, Enterprise Drive, Wolverhampton, WV10 7DF (1 component)

Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Inactive • 2021-22 (T-1)
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (6 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary … (3)

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Lakeside EfW, Lakeside Road, Colnbrook, SL3 0FE (6 components)

Energy from Waste Facility (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lister Road Dudley West Midlands DY2 8JT (3 components)
• 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW (2)
• 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change …
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Newhurst Quarry, Ashby Road East, Shepshed, Leicestershire, LE12 9BU (2 components)

An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility (2)

Inactive • 2023-24 (T-4), 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot 8 Protos Grinsome Road Elton CH2 4LF (1 component)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Inactive • 2022-23 (T-4)
Port Talbot Steelworks, Port Talbot, SA13 2NG (1 component)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (6 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being … (2)
• 2 stream municipal waste incinerator
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wolverhampton EfW Crown Street West Midlands WV1 1QB (3 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW (2)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change …
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...