Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

6 unique locations (15 components)

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
Lister Road Dudley West Midlands DY2 8JT (2 components)
• 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW
• 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change in registered address for DWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Coal/biomass Energy from Waste Dudley Waste Services Limited Existing Generating CMU Dudley Incinerator Dudley Incinerator Rejected DY2
Inactive • 2019-20 (T-1), 2018-19 (T-1)
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (3 components)

Energy from Waste Recovery Facility (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (2 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Coal/biomass Energy from Waste HANFORD WASTE SERVICES LIMITED Existing Generating CMU Stoke Incinerator Stoke Incinerator ST4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (3 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste NORTHUMBERLAND ENERGY RECOVERY LTD Existing Generating CMU STV Line 3 EfW STV Line 3 EfW TS23
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (3 components)

Existing Energy from Waste Plant (3)

Coal/biomass Energy from Waste SOUTH TYNE & WEAR ENERGY RECOVERY LTD Existing Generating CMU STV Lines 4 & 5 EfW STV Lines 4 & 5 EfW TS23
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Wolverhampton EfW Crown Street West Midlands WV1 1QB (2 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Coal/biomass Energy from Waste Wolverhampton Waste Services Limited Existing Generating CMU Wolverhampton Incinerator Wolverhampton Incinerator Rejected WV1
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 6 locations