DSR (Demand Side Response)

11 unique locations (175 components)

YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
21.54 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD (91 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2024-25 (T-1) ...
75.61 MW
To be confirmed - the components of the Unproven DSR CMU are to be determined. (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive • 2018-19 (T-1)
10.00 MW
To be confirmed - the components of the unproven DSR are to be determined (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

Inactive • 2019-20 (T-1)
16.86 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (4 components)

A new build, gas fuelled generation station. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
111.11 MW
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (9 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
121.75 MW
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (5 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
121.75 MW
N/A as prequalification stage for an unproven DSR CMU the components are not finalised. (4 components)

Industrial process within the Tata Steel estate - specific installations TBC

Inactive • 2021-22 (T-4), 2018-19 (T-1)
20.00 MW
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (30 components)
• Industrial Steelmaking / Manufacturing Site
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity.
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• ... and 2 more unique descriptions
Active • 2025-26 (T-1), 2024-25 (T-1) ...
96.66 MW
Carlton, Stockton-on-Tees, TS21 1EA (10 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.60 MW
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.18 MW
Loading map...
Showing 11 locations