12 unique locations (609 components)

Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
To be determined (102 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)
• N/A
• Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones 275kV 'B' Substation.
Inactive • 2023-24 (T-4)
488.34 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
762.63 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (19 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Keadby GT3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
132.13 MW
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off of Venture Road, Fleetwood, Lancashire, FY7 8RS (22 components)
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Unproven DSR Component
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.09 MW
Fowler Welch - Site 3, W Marsh Rd, Spalding PE11 2HR, UK (23 components)
• A 10MW new build gas generating station..
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.43 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (69 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.38 MW
Loading map...
Showing 12 locations