Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9 unique locations (210 components)

WV10 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
81.60 MW
WR3 (35 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
61.59 MW
PR8 (49 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
202.45 MW
Muiresk RWP Muiresk Turriff Aberdeenshire (4 components)

Muiresk Water Pumping Station

Inactive • 2019-20 (T-1)
LA2 (33 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
62.66 MW
L23 (30 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
102.51 MW
Gowanbank TWP Gowanbank Armadale Bathgate (3 components)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (3 components)

Glenhove Water Pumping Station

Inactive • 2019-20 (T-1)
CT3 (31 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
104.33 MW
Loading map...
Showing 9 locations