DSR (Demand Side Response)

8 unique locations (133 components)

THATCHES THE STREET PRESTON ST. MARY SUDBURY SUFFOLK CO10 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHES SCHOOL LANE CHEARSLEY AYLESBURY BUCKINGHAMSHIRE HP18 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHED COTTAGE WORTLEY WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
THATCHED COTTAGE WHITENAP LANE ROMSEY HAMPSHIRE SO51 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Wind Turbine Generators x 15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.94 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
• The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
• To be confirmed once CMU components are known
Active • 2026-27 (T-4), 2022-23 (T-4)
35.45 MW
ASDA Didcot Ambient Distribution Centre, Sutton Courtenay Rd, Abingdon, OX14 4SE (11 components)
• 4 x reciprocating engines
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
10.21 MW
Loading map...
Showing 8 locations