DSR (Demand Side Response)

46 unique locations (980 components) - Page 1 of 2

XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (11 components)
• Flour & semolina milling business
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
XPO - Spalding, W Marsh Rd, Spalding PE11 2HR, UK (18 components)
• 1 x hydro turbine & synchronous generator
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.97 MW
XPO - Plymouth, Estover Road, Plymouth, Devon, PL6 7PF (10 components)
• Aggregate CMU from Multiple Sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.19 MW
XPO - Avonmouth, St AndrewsRoad, Avonmouth, Bristol BS11 9HP (20 components)
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.26 MW
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (5 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Flour & semolina milling business
Active • 2024-25 (T-1), 2021-22 (T-4) ...
0.54 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2330.50 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
274.49 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)
• A gas fuelled generating station.
• Existing Energy from Waste Plant
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.84 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
Station Rd, Cowie, Stirling FK7 7BQ (3 components)
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
3.60 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (21 components)
• Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
• Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
• Newbuild gas generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
826.58 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (9 components)
• A Battery Energy Storage System
• Aggregate CMU from multiple sources
• Single Shaft CCGT (Module 2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
580.82 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)
• Aggregate CMU from Multiple Sources
• Front of the Meter battery storage asset located in Devon.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.79 MW
RK Drysdale, Old Cambus Quarry, Cockburnspath, Berwickshire, TD13 5YS (19 components)
• Flour & semolina milling business
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.78 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Mill Street, Liverpool, L8 6QZ (4 components)
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-1), 2018-19 (T-1)
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
46.94 MW
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (6 components)
• Aggregate CMU from Multiple Sources
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.58 MW
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (12 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery Storage Plant
• Flour & semolina milling business
Active • 2025-26 (T-4), 2024-25 (T-1) ...
59.60 MW