Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

8 unique locations (132 components)

Tilbury Freeport Tilbury Essex RM18 7HE (9 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.65 MW
Tilbury Freeport Tilbury Essex RM18 7HE (6 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.13 MW
Port of Tilbury, Tilbury, RM18 7EH (3 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Port of Tilbury, Tilbury, RM18 7EH (2 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Land North of Thame Lane, Culham, Abingdon, Oxfordshire, OX14 3GY (5 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering at the grid connection point. The detailed co-ordinates 'TQ 62205 76671' or what3words 'twist.launch.novel' will take you to an image of the site (in Google Maps you can see the storage system itself in the photo).
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2027-28 (T-4), 2022-23 (T-3) ...
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (46 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2714.06 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (4 components)
• Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering at the grid connection point. The detailed co-ordinates 'TQ 62205 76671' or what3words 'twist.launch.novel' will take you to an image of the site (in Google Maps you can see the storage system itself in the photo).
• New Build CMU comprising of battery storage and associated plant
Active • 2028-29 (T-4), 2026-27 (T-4)
47.89 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.92 MW
Loading map...
Showing 8 locations