69 unique locations (801 components) - Page 1 of 3

Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)
• 2026 kW CHP unit
• A Battery Energy Storage System
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wimbourne Bournemouth BH21 5EP (2 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2019-20 (T-1)
Weighbridge Road, Shotton, Deeside, CH5 2LL (20 components)
• A gas fuelled generating station.
• Paper mill industrial site
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
48.00 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (19 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
30.00 MW
to be provided once CMU Components are known (91 components)
• Aggregated Generation - Diesel
• The CMU component is an aggregation of turn-down and onsite generation
• to be provided once CMU Components are known
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
91.69 MW
To be determined (102 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S22ST1 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (10 components)
• 2MW BESS
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TA9 3QG (11 components)
• N/A
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TA6 3JS (8 components)

Water treatment centre

Inactive • 2018-19 (T-1), 2017-18 (T-1)
TA5 2AW (8 components)

Water treatment centre

Inactive • 2018-19 (T-1), 2017-18 (T-1)
TA4 2UN (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (10 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Stockport DSR
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
29.10 MW
St. Alban's Road Watford Herts WD24 7RG (3 components)

Commercial printers

Inactive • 2022-23 (T-4), 2019-20 (T-1)
St. Alban's Road Watford Herts WD24 7RG (2 components)

Commercial printers

Inactive • 2022-23 (T-4), 2019-20 (T-1)
SP5 3EU (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (8 components)

Water treatment centre

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (5 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Sheepbridge Lane, Sheepbridge, Chesterfield, S41 9RX (6 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Diesel and/or gas reciprocating engines.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Riverside Crossgate Drive Queens Drive Industrial Estate NG2 1LW (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)