DSR (Demand Side Response)

6 unique locations (124 components)

Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (7 components)
• The CMU Component reduces import demand by turning on back up generation.
• Unit 1 fuelled by Biomass at Drax Power Station
Active • 2027-28 (T-4), 2020-21 (T-4) ...
14.00 MW
Mousehold WTW, MOUSEHOLD WB, Telegraph Lane, NORWICH, NR1 4HZ (7 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• The CMU Component reduces import demand by turning on back up generation.
Active • 2027-28 (T-4), 2020-21 (T-1) ...
1.37 MW
Hem Lane, Bridgewater Road, Bristol, BS48 3SQ (16 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (8 components)
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2020-21 (T-4) ...
1.72 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (69 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
Banwell, , Banwell, BS29 6NY (17 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Loading map...
Showing 6 locations