Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

52 unique locations (565 components) - Page 1 of 3

Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (7 components)
• The CMU Component reduces import demand by turning on back up generation.
• Unit 1 fuelled by Biomass at Drax Power Station
Active • 2027-28 (T-4), 2020-21 (T-4) ...
14.00 MW
West Wickham (Croydon) WTW, Addington Road, , West Wickham, United Kingdom, BR4 9BF (4 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Westfield Biomass Power Station, Westfield, By Cardenden, Fife, KY5 0HR (3 components)
• Incineration of biomass to generate steam which drives a turbine.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.40 MW
Uppingham STW, Sewage Treatment Works, Seaton Road, Uppingham, OAKHAM Leicestershire, LE15 9TX (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
21.29 MW
Stanbridgeford STW, STANBRIDGEFORD STW, A505 Bypass, Stranfordbridge, LEIGHTON BUZZARD Bedfordshire, LU7 9JG, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
SHENLEY GROUNDS WB, WHADDON ROAD CALVERTON, MK19 6EU (10 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU Component reduces import demand by turning on back up generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
17.03 MW
Ravensthorpe WTW, RAVENSTHORPE WW, Teeton Road, Ravensthorpe, NORTHAMPTON, NN6 8EJ, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Pitsford WW, PITSFORD WW, Grange Lane, Pitsford, NORTHAMPTON, NN6 9AP, (6 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
OLD STRATFORD WB, OLD STRATFORD WB, Crosgrove Road, Old Stratford, MILTON KEYNES, MK19 6BB, (8 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Northampton River SP, Northampton-Riverside Museum Way, Fairground Way, Riverside Business Park, NORTHAMPTON, NN3 9HU, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2527.80 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (18 components)
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.09 MW
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
18.48 MW
Marston WBS, Marsh Lane, Marston Sliproad, Oxford, United Kingdom, OX3 0PF (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (3 components)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA..
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.49 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (4 components)
• Gas fired CHP
• New Build CMU comprising of battery storage and associated plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
8.16 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (4 components)
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate
• New Build CMU comprising of battery storage and associated plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
8.16 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (44 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2028-29 (T-4), 2027-28 (T-4) ...
112.29 MW
Ise Valley TPS, WELLINGBOROUGH-ISE VALLEY TPS, Irthlingborough Road, WELLINGBOROUGH Northamptonshire, NN8 1RA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Loading map...
Showing 25 locations