Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

446 unique locations (5676 components) - Page 1 of 18

YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Yeomans Way, Bournemouth, BH8 0BQ (12 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
0.73 MW
XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wrexham Industrial Estate Wrexham LL13 9UG (18 components)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (8 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (14 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
0.87 MW
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
1.63 MW
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (17 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Windmill Hill Business Park, Swindon, SN5 6QR (10 components)
• Load curtailment and standby generation
• Load reduction via standby generation taking onsite load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (11 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (11 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
West Pennard, Glastonbury, BA6 8NN (21 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (6 components)

Flour & semolina milling business

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (37 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
15.01 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
58.80 MW
Loading map...
Showing 25 locations