Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

312 unique locations (2524 components) - Page 1 of 13

YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (14 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (10 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (2 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (4 components)

Flour & semolina milling business

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
West Carr Lane, Hull HU7 0BS, UK (7 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Weighbridge Road, Shotton, Deeside, CH5 2LL (22 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (14 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unproven DSR yet to be procured (58 components)

Unproven DSR yet to be procured

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, Hampshire, RG24 8QW (4 components)

Gas generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 6, Lime Kilns Business Park, Hinckley, Leicestershire, LE10 3EL (8 components)

Gas generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
To be Determined (26 components)
• Aggregated Generation - CHP, AD & Hydro
• Aggregated Generation - Diesel
Active • 2024-25 (T-4), 2023-24 (T-4) ...
To be confirmed - the components of the Unproven DSR CMU are to be determined. (3 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive • 2018-19 (T-1)
To be confirmed once CMU components are known (98 components)

To be confirmed once CMU components are known

DSR E.ON UK PLC Conditional
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
190.46 MW
Loading map...
Showing 25 locations