Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

7 unique locations (36 components)

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
The Christie Hospital, Wilmslow Road, Manchester, M20 4BX (1 component) Geocoding Needed

VIT43A - CHP unit at The Christie Hospital, Wilmslow Road, Manchester, M20 4BX

Active β€’ 2025-26 (T-4)
2.41 MW
Ninewells Hospital, Dundee, DD2 1UB (8 components) Geocoding Needed
β€’ A Packaged 3.976MW, 11kV CHP
β€’ A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
7.01 MW
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (6 components) Geocoding Needed
β€’ New 4.5MW CHP at Oxford Hospital
β€’ VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
14.16 MW
Imperial College London, South Kensington Campus, SW7 2AZ (12 components) Geocoding Needed
β€’ A 4.5MW gas fired reciprocating engine CHP (Engine 1).
β€’ A 4.5MW gas fired reciprocating engine CHP (Engine 2).
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
24.26 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (4 components) Geocoding Needed
β€’ VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
β€’ VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU COV COV +1 more CV2
Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
9.03 MW
Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ (1 component) Geocoding Needed

VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ

Active β€’ 2025-26 (T-4)
2.41 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (4 components) Geocoding Needed

A 3.36MW gas fired reciprocating engine CHP.

Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU CQH CQH +1 more M2
Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
9.00 MW
Loading map...
Showing 7 locations