Combined Heat and Power (CHP)

108 unique locations (1328 components) - Page 1 of 5

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components) Geocoding Needed
β€’ The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
β€’ The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
β€’ The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
20.05 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components) Geocoding Needed
β€’ 2MW gas CHP engine in a horticultural environment
β€’ One 1.5 MW gas CHP engine in a horticultural environment
β€’ One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
25.64 MW
374.81 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components) Geocoding Needed
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
β€’ Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active β€’ 2027-28 (T-4)
14.23 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active β€’ 2027-28 (T-4)
14.23 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components) Geocoding Needed
β€’ Gas CHP in a horticultiral environment providing heat for crop growth
β€’ One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
16.62 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
39.32 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
5.96 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components) Geocoding Needed

Warrington Existing Site CHP

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
13.64 MW
The Ridgeway, Enfield, Middlesex, EN2 8JL (10 components) Geocoding Needed
β€’ On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
β€’ On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
5.74 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components) Geocoding Needed
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
β€’ Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
6.90 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
β€’ Two gas CHP engines in commercial horticultural environment with no auxilliary load (2)
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX14 FLEX14 +2 more HU17
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components) Geocoding Needed
β€’ The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
β€’ The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
40.32 MW
St Marks Boilerhouse, Donaldson Road, LEICESTER, Leicestershire LE4 6BF (13 components) Geocoding Needed

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
15.88 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (9 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E3
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.48 MW
Staithes Road, Preston, Hull, HU12 8TB (17 components) Geocoding Needed
β€’ CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
β€’ Gas fired CHP unit
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
18.11 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components) Geocoding Needed

Gas Fired CHP

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
22.71 MW
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components) Geocoding Needed
β€’ 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW
β€’ 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 MW.
β€’ 2X gas reciprocating engines with a total gross power capacity of 3.973 MW
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Southampton General Hospital Southampton General Hospital +2 more SO16
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
20.83 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
6.66 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components) Geocoding Needed
β€’ 8.300MW Gas Turbine installation
β€’ 8.3MW Gas Turbine installation
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
46.90 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (3 components) Geocoding Needed

One 2MW gas CHP engine in a horticultural environment

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX159 SL2
Active β€’ 2027-28 (T-4), 2024-25 (T-1) ...
5.31 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components) Geocoding Needed

Gas fuelled CHP generation plant

Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
28.50 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS, United Kingdom (12 components) Geocoding Needed
β€’ CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
β€’ CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
β€’ CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
453.78 MW
Loading map...
Showing 25 locations