Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

105 unique locations (1229 components) - Page 1 of 5

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.05 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.64 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.62 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.10 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.32 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.96 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.64 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 PL26
Active • 2026-27 (T-4), 2025-26 (T-4) ...
13.60 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.42 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)

1.280MW CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.65 MW
The Ridgeway, Enfield, Middlesex, EN2 8JL (10 components)
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.74 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.32 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (9 components)

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.48 MW
Staithes Road, Preston, Hull, HU12 8TB (17 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.11 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (3 components)

Gas Fired CHP

Combined Heat and Power (CHP) E.ON UK PLC New Build Generating CMU SON_CHP SON_CHP HX4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.78 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (10 components)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected WV15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.71 MW
Solvay, Trinity St, Oldbury, B69 4LW (6 components)

Existing Generation on existing site - CHP

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU Rejected B69
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.66 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
• 8.300MW Gas Turbine installation
• 8.3MW Gas Turbine installation
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.90 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS, United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
453.78 MW
Loading map...
Showing 25 locations