Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

7 unique locations (88 components)

3678.80 MW
LAND ON THE SOUTH EAST SIDE OF WHITEGATE WHITE LUND INDUSTRIAL ESTATE MORECAMBE LA3 3DU (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EV charging at residential premises
Active • 2027-28 (T-4), 2022-23 (T-3) ...
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
• Reciprocating genset
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.56 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (13 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• CMU consisting of a gas reciprocating engine and alternator
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.70 MW
Cottam Development Centre Power Station Cottam Retford DN22 0TF (6 components)
• CHP on a hospital site
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Development Centre (CDC) CCGT single unit station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
138.91 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Loading map...
Showing 7 locations