Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)
• Gas fired CHP unit
• Load reduction on site supported by non-exporting standby generation.
• The CMU component is an aggregation of turn-down and onsite generation
Active • 2026-27 (T-4), 2023-24 (T-4) ...
5.46 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW