Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
7.26 MW
William Lee - Site 1, Callywhite Lane, Dronfield, S182XU (13 components)
• DSR Component providing load turn down at a data centre
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• on site generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.48 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
• A 3.36MW gas fired reciprocating engine CHP.
• A new Build Generating Storage CMU
• To be confirmed once components are known
Active • 2024-25 (T-4), 2022-23 (T-4) ...
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.68 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (20 components)
• 1 x OCGT
• A site with two gas engine CHPs, providing hot water to a local district heating network
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
9.03 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (16 components)
• CHP engine in horticultural environment with no auxilliary load
• existing on site CHP
• existing onsite CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.46 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)
• A gas fuelled generating station.
• Existing Energy from Waste Plant
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.84 MW
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
80.18 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• Bus depot site
• Load reduction
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.59 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (5 components)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.67 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (22 components)
• Existing Generation on existing site - CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
Active • 2027-28 (T-4), 2025-26 (T-4) ...
43.59 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (15 components)
• 4MW battery co-located with a solar farm
• 8.3MW Gas Turbine installation
• Unit 3 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.47 MW
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (12 components)
• A gas engine CHP site providing steam and electricity to an industrial unit
• An Exiting diesel grid support plant
• CHP plant
Active • 2024-25 (T-1), 2023-24 (T-4) ...
6.31 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (17 components)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Wind Turbine Generators x 15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.94 MW
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (7 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• 4MW battery co-located with a solar farm
• Gas reciprocating engine
Active • 2028-29 (T-4), 2026-27 (T-4) ...
1.83 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled generating station.
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
0.74 MW
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery storage
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
19.04 MW
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (7 components)
• A gas engine CHP site providing hot water to a local district heating network
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Plastics recycling facility located next to material recycling facility comprising several DSR loads: belts, cranes.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.37 MW
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (16 components)
• A gas engine CHP site providing hot water to an industrial unit
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.57 MW
Marks and Spencer, Holmbush Centre, Upper Shoreham Road Shoreham-by-Sea, BN43 6TD (6 components)
• Combined Heat and Power Plant Olympic Park London
• DSR component providing load turn down at a retail store
Active • 2027-28 (T-4), 2020-21 (T-1) ...
3.42 MW
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (16 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
0.75 MW
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW