Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
XPO - Logistics Luton, Skimpot Road, Luton LU4 0JD (11 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (20 components)
• CHP Unit
• CHP engine in a horticultural environment, natural gas, no aux load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (7 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
3.08 MW
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (9 components)
• 4MW of DSR
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (33 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)
• 2026 kW CHP unit
• A Battery Energy Storage System
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wight Salads Arreton Newport Isle of Wight PO30 3AR (5 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbyshire, S80 3LH (9 components)
• CHP
• Gas reciprocating engines as the generating unit.
• Standby diesel generator that reduces site load when generating.
Active • 2027-28 (T-4), 2023-24 (T-4) ...
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)
• Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network
• Commercial sites
• Gas reciprocating engines.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
6.38 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is a long standing existing CHP unit located on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
1180.44 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (22 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.93 MW
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (6 components)
• CHP
• Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of batteries, power conversion systems, transformers, switchgear, monitoring and control systems.
• The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
29.38 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (12 components)
• A gas turbine installed at Aberdeen Royal Infirmary
• Existing Generation on existing site - CHP
• N/A
Active • 2027-28 (T-4), 2026-27 (T-4) ...
63.45 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.68 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Walton-on-Thames WTW, Hurst Road, , Walton-on-Thames, United Kingdom, KT12 2EG (4 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (4 components)
• A gas engine CHP site providing hot water to a local district heating network
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity from the sending end is converted to direct current electricity and transmitted through the cables. The direct current electricity will be converted into alternating current at the receiving end, before it is transmitted to consumers via the onshore electricity networks in GB and Denmark. In GB, the grid connection point for Viking Link is at Bicker Fen substation. The converter station at North Ing Drove is 2km from the substation which is connected via AC underground cables. From the converter station, the British onshore section covers 68km of HVDC underground cable to the landfall point of Boygrift which marks the beginning of the offshore route. The marine section of the link has a total of 621km from Boygrift to the Danish landing point of Blaabjerg through British, Dutch, German and Danish waters. From the Danish landfall point in Blaabjerg the Danish onshore section of Viking Link covers 76km of HVDC underground cable to the converter station which is adjacent to the Revsing substation.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Victory Road, Derby, Derbyshire, DE24 9HX (7 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• Existing CCGT
• Existing OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
164.48 MW
Uskmouth Power Station, West Nash Road, Nash, Newport, Gwent NP18 2BZ (9 components)
• 2MW (1 X 2 MW diesel gensets )
• One CHP engine in a horticultural environment with no auxilliary load.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
66.64 MW
University of Warwick, Coventry, CV4 7AL (55 components)
• N/A
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2023-24 (T-4) ...
20.78 MW