Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal/biomass

19 unique locations (874 components)

STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)
• A gas fuelled generating station.
• Existing Energy from Waste Plant
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
62.84 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB (13 components)
• Existing CMU comprising of battery storage and associated plant
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
104.96 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (14 components)
• Battery strorage unit
• Gas Peaking Reciprocating Engine
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
47.60 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Existing Energy from Waste Plant
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
56.00 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
94.17 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW
EnviroWales - Ebbw Vale - Site 2, Plateaux 1 & 2 Rassau Industrial Estate Ebbw Vale Blaenau Gwent NP23 5SD (17 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-4) ...
12.93 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Drax Power Station, Drax, Selby, YO8 8PH (23 components)
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
341.88 MW
Cornwall Energy Recovery Centre St Dennis Cornwall PL26 8DY (5 components)
• Existing Energy from Waste Plant
• Nantwich Existing Site CHP
• New Build Energy from Waste Plant
Inactive • 2022-23 (T-1), 2018-19 (T-1) ...
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Load curtailment
• Syngenta - CHP unit
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
10.22 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (25 components)
• Demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
164.37 MW
ABP Wessex, Wessex House, Plews Way, Leeming Bar, Northallerton DL7 9UL (24 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Steam turbine at energy from waste facility located in Newhaven East Sussex
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.22 MW
ABP UK Shrewsbury, 1 Battlefield Rd, Shrewsbury SY1 4AH, United Kingdom (24 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Milling Motor Pelletizers, Fans etc
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.13 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
Loading map...
Showing 19 locations