Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (12 components)
• 8MW Energy Storage facility located in Harrogate.
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• New build Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• West Burton A Power Station CMU 4 WA4-19= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2023-24 (T-4) ...
1722.73 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Generating Unit 4
Inactive • 2022-23 (T-4)
Unit 23 B, South Gyle Crescent, Edinburgh, EH12 9EQ (3 components)
• Battery Energy Storage System
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2022-23 (T-3), 2021-22 (T-4)
The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Gas Fired - CHP
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.69 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
OI Manufacturing Alloa Kelliebank House, Glasshouse Loan, Alloa FK10 1NT, United Kingdom (25 components)
• Aberthaw 8 Coal fired
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.19 MW
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
• Load reduction on site supported by non-exporting standby generation.
• The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
• West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Little Beanit Farm, Waste Lane, Balsall Common, Coventry, CV7 7GH (1 component)

Ratcliffe Unit 4 coal-fired unit

Active • 2024-25 (T-4)
Land Off Gelderd Road, Beeston, Leeds. LS12 6DX. (3 components)
• A 20MW New Build gas fuelled generating station.
• Aggregate CMU from multiple sources
• Ratcliffe Unit 2 coal-fired unit
Active • 2024-25 (T-4), 2022-23 (T-4)
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Lancaster University, Bailrigg, Lancaster, LA1 4YW (12 components)
• Gas fired CHP unit
• Ratcliffe Unit 2 coal-fired unit
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.45 MW
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (12 components)
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
• Gas reciprocating engines
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Gowanbank TWP Gowanbank Armadale Bathgate West Lothian EH48 5AP (3 components)
• Gowanbank Water Pumping Station
• Ratcliffe Unit 1 coal-fired unit
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Furniss & White, 17 Abbey Way, North Anston Trading Estate, North Anston, Sheffield, S25 4JL (24 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.91 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW
enfinium Ferrybridge 1 Limited Kirkhaw Lane off Stranglands Lane Knottingley West Yorkshire WF11 8DX (4 components)
• Aux. load separately metered
• Existing CCGT unit
• FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.70 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW