The Royal Marsden NHS Foundation Trust, Downs Road, Sutton, SM2 5PT (8 components)
• Behind-the-meter battery storage system located at Emirates Stadium in London
• Gas Fired - CHP
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (10 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Stockport DSR
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
29.10 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (5 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

Active • 2025-26 (T-1), 2019-20 (T-1) ...
1.35 MW
Seal Sands, Middlesbrough, TS2 1UB (26 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Seal Sands, Middlesborough, TS2 1UB (26 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (12 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
1.82 MW
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (6 components)

One 3.7 MWe gas fired CHP (Centrax KB5)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (4 components)

One 3.7 MWe gas fired CHP (Centrax KB5)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Pyewipe, Grimsby DN31 2SR (6 components)

CHP

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Priory Street, Ware, Hertfordshire, SG12 0DJ (14 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2021-22 (T-1) ...
Par Docks, Par, Cornwall PL24 2SQ (18 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
6.73 MW
Par Docks, Par, Cornwall PL24 2SQ (16 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (8 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas turbine
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (21 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
New Victoria Park, Grange Road, Glasgow, G42 9LF (19 components)
• Component has yet to be procured.
• Generators at hospital site
• The CMU component BARR17 will consist of one CHP engine with a generation capacity of 4.5 MW.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
3.41 MW
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (4 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (2 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Lhoist UK Ltd Hindlow Buxton SK17 0EL (12 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (5 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
Kellingley Colliery Turvers Lane, Knottingley, West Yorkshire, WF11 8DT. (7 components)
• 5 x Jenbacher 420 (1.4MW)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (19 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...