Battery

9 unique locations (330 components)

Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.74 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (38 components)
• Cruachan pumped storage hydro plant - Unit 1
• Pre-refurbishment Unit 3 Cruachan pump storage hydro plant
• Refurbishment Unit 3 Cruachan pump storage hydro plant
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (17 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.72 MW
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.10 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
AL4 (72 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
168.19 MW
Loading map...
Showing 9 locations