Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SK17 7JB"

6 unique locations (21 components)

Sort by: Relevance A-Z Components MW Date
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
No capacity data
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
No capacity data
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
Waterswallows Road Buxton Derbyshire SK17 7JB (14 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115mw diesel/ and or gas dual fuel reciprocating engine
• 2.116MW Diesel and / or gas dual fuel reciprocating engine
Inactive • 2018-19 (T-1)
No capacity data
Waterswallows Road, Buxton, Derbyshire, SK17 7JB (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
No capacity data
Waterswallows Road, Fairfield, Buxton, SK17 7JB (2 components)

Diesel and/or gas reciprocating engines.

Inactive • 2017-18 (T-1)
No capacity data
Loading map...
Showing 6 locations