Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...
GrokAI Overview

Search Results for "RM14 3PL"

6 unique locations (19 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)

A new build 48MW battery energy storage system

Active • 2025-26 (T-4), 2024-25 (T-4) ...
14.82 MW (CMU HCTF21)
(Estimated)
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Not Prequalified RM14
Active • 2024-25 (T-4)
46.18 MW (CMU WCSE19)
(Estimated)
Clay Tye Road, Upminister, RM14 3PL (6 components)

48MW Battery Energy Storage facility connected to 132kv network

Active • 2025-26 (T-4), 2024-25 (T-4) ...
14.82 MW (CMU CTF221)
(Estimated)
Clay Tye Road, Upminster, RM14 3PL (2 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Not Prequalified RM14
Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW (CMU C19WT0) (Historical)
(Estimated)
Clay Tye Road, Upminster, RM14 3PL, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Conditional RM14
Inactive • 2022-23 (T-4)
46.14 MW (CMU CSE19W) (Historical)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->