Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PO30 3AS"

4 unique locations (17 components)

Sort by: Relevance A-Z Components MW Date
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (9 components)
• The CMU GLAS16 consists of two identical components, with each CHP engine delivering 5.5MW. The total CMU generation capacity is declared 11MW. The new development of two CHP engines which will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
• The CMU component GLAS02 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
0.00 MW
(Estimated)
Lane End Energy Centre 1 Macketts Lane, Hale Common, Newport PO30 3AS Isle of Wight (5 components)

The CMU LANE16 consists of two identical components (JENBA4 &5), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
LANE END, MACKETTS LANE, HALE COMMON, ISLE OF WIGHT, PO30 3AS (1 component)

The CMU component will have a connection capacity of 4.6MW. Gas-fired reciprocating engine will be the technology used

Active • 2026-27 (T-4)
4.20 MW
Macketts Lane, Arreton, Isle of Wight PO30 3AS (2 components)

The CMU component will have a connection capacity of 7.5MW. Gas-fired reciprocating engine will be the technology used

Active • 2026-27 (T-4)
13.70 MW
Loading map...
Showing 4 locations