Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...
GrokAI Overview

Search Results for "PL12 6NE"

2 unique locations (2 components)

Sort by: Relevance A-Z Components MW Date
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU PL12
Active • 2027-28 (T-4)
6.50 MW (CMU PPLD23)
(Estimated)
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Not Prequalified PL12
Active • 2026-27 (T-4)
8.98 MW (CMU PPLD22)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->