Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...
GrokAI Overview

Search Results for "PE34 3AL"

5 unique locations (28 components)

Sort by: Relevance A-Z Components MW Date
Poplar Avenue, King' Lynn, PE34 3AL (10 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.57 MW (CMU 8RES13)
(Estimated)
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)

The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.

Active • 2028-29 (T-4), 2021-22 (T-4)
42.50 MW (CMU PPKL02)
(Estimated)
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

DSR GRIDBEYOND LIMITED Unproven DSR CMU PE34
Active • 2027-28 (T-4), 2024-25 (T-1)
No capacity data
(Estimated)
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (11 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine

Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW (CMU 8RES12)
(Estimated)
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, PE34 3AL (1 component)

The DSR is created by load management of the on site, twin stream, paper De-Inking Plant. Metering arrangements will measure the net reduction resulting from an instruction to reduce the …

DSR Palm Paper Limited Unproven DSR CMU PE34
Active • 2028-29 (T-4)
8.55 MW (CMU PPKL03)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->