Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...
GrokAI Overview

Search Results for "PA7 5NS"

3 unique locations (6 components)

Sort by: Relevance A-Z Components MW Date
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. This CMU is adjacent …

Storage FlexibleGridPower Ltd New Build Generating CMU Not Prequalified PA7
Inactive • 2021-22 (T-4), 2018-19 (T-1)
2.86 MW (CMU ESBS15) (Historical)
(Estimated)
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS., See map. (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Storage FlexibleGridPower Ltd Not Prequalified PA7
Inactive • 2021-22 (T-4), 2018-19 (T-1)
5.35 MW (CMU ESBS14) (Historical)
(Estimated)
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Active • 2025-26 (T-4), 2022-23 (T-4)
5.97 MW (CMU EKCM21)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->