Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "MK45 5JD"

12 unique locations (53 components)

Sort by: Relevance A-Z Components MW Date
Land North of Clayhill Farm Westoning,MK45 5JD (3 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD

LIMEJUMP LTD Not Prequalified MK45
Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
Land North of Clayhill Farm, Westoning MK45 5JD (5 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Inactive • 2028-29 (T-4), 2027-28 (T-4) ...
0.05 MW
Greenfield Road, Bedford MK45 5JD (2 components)

gas fired reciprocating engines

Inactive • 2020-21 (T-4)
0.00 MW
(Estimated)
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.00 MW
(Estimated)
No capacity data
No capacity data
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (12 components)

CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.62 MW
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Land North of Clayhill Farm, Westoning, MK45 5JD (8 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.40 MW
Land North of Clayhill, Westoning, MK45 5JD. (4 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Inactive • 2020-21 (T-4)
0.00 MW
(Estimated)
Loading map...
Showing 12 locations