Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "DE11"

15 unique locations (58 components)

Sort by: Relevance A-Z Components MW Date
ARTHUR STREET CASTLE GRESLEY SWADLINCOTE DERBYSHIRE DE11 (8 components)

EV charging at residential premises (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.21 MW (Est from CMU)
(De-rated)
BATH ROAD, Castle Gresley, SWADLINCOTE, DERBYSHIRE, DE11 (8 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
No capacity data
DE11 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
HEWER DRIVE CASTLE GRESLEY SWADLINCOTE DERBYSHIRE DE11 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
Land at William Nadin Way, Tetron Point, Swadlincote, DE11 0WT (1 component)

2 x 2MW Gas fuelled generator units to be installed on designated land within a compound located at Tetron point

Active • 2024-25 (T-4)
No capacity data
Land off Mount Road, Castle Gresley, Swadlincote, DE11 9ES (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
Land of Mount Road, Castle Gresley, Swadlincote, DE11 9ES (4 components)

New build gas generator

GRESLEY POWER LTD Balancing Reserve DE11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
MOUNT PLEASANT ROAD CASTLE GRESLEY SWADLINCOTE DERBYSHIRE DE11 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
Ryder Close Swadlincote Derbyshire DE11 9EU (2 components)

Unproven DSR - Behind the meter DC coupled solar with battery storage of 1MW. DSR will be provided by managing load and export from the site within the limits of …

Active • 2025-26 (T-1), 2024-25 (T-1)
No capacity data
0.0080 MW
Loading map...
Showing 10 locations