Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...
GrokAI Overview

Search Results for "CH5 2LL"

6 unique locations (28 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
LAND AT WEIGHBRIDGE ROAD, DEESIDE, CH5 2LL (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.82 MW (CMU UR0039) (Historical)
(Estimated)
Parc Adfer Energy Recovery Facility, Deeside Industrial Park, Deeside, Flintshire, CH5 2LL (1 component)

An energy from waste facility located in North Wales and designed to generate electricity

Inactive • 2020-21 (T-4)
14.78 MW (CMU ParcAd) (Historical)
(Estimated)
UPM Shotton, Weighbridge Road, Shotton, Deeside CH5 2LL (4 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.37 MW (CMU DSR303) (Historical)
(Estimated)
Weighbridge Rd, Deeside CH5 2LL, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Reciprocating engines URBAN RESERVE LIMITED New Build Generating CMU Rejected CH5
Inactive • 2022-23 (T-4)
1.90 MW (CMU BPUR06) (Historical)
(Estimated)
Weighbridge Road, Shotton, Deeside, CH5 2LL (9 components)

Paper mill industrial site

DSR KIWI POWER LTD Unproven DSR CMU Existing Generating CMU Rejected CH5
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
No capacity data
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->