Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PO30 3AS"

6 unique locations (10 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
Glasshouse Energy Centre Wight Salads Nursery/Macketts Land Nursery Macketts Lane, Hale Common, Newport, Isle of Wight PO30 3AS (4 components)

The CMU component GLAS01 consists of a CHP engine delivering 5.5MW. The CMU component will be supplying heat, CO2 and power to the on-site Nursery.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
9.74 MW (CMU GLAS17) (Historical)
(Estimated)
Lane End Energy Centre 1 Macketts Lane, Hale Common, Newport PO30 3AS Isle of Wight (2 components)

The CMU LANE16 consists of two identical components (JENBA4 &5), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU …

P3P LANE END LIMITED Existing Generating CMU Rejected PO30
Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Lane End Energy Centre 1 Macketts Lane, Hale Common, Newport PO30 3AS Isle of Wight (2 components)

The CMU LANE16 consists of two identical components (JENBA4 &5), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU …

Reciprocating Engines P3P LANE END LIMITED Existing Generating CMU Rejected PO30
Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
LANE END, MACKETTS LANE, HALE COMMON, ISLE OF WIGHT, PO30 3AS (1 component)

The CMU component will have a connection capacity of 4.6MW. Gas-fired reciprocating engine will be the technology used

Active • 2026-27 (T-4)
4.20 MW (CMU LANE22)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->