Components Ranked by De-rated Capacity
Displaying 1-3 of 3 components with capacity data.
-
Storage (Duration 1h)
The CMU component will have a connection capacity of 2.52MW. BYD Battery
-
Storage (Duration 1h)
The CMU component will have a connection capacity of 2.5MW. BYD Battery
-
Storage (Duration 2h)
Battery Energy Storage, 49.990 MW installed for a 2hr system.