Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

181 unique locations (1096 components) - Page 1 of 8

Active MW: 393.19 MW
Inactive MW: 784.54 MW
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (8 components)

4MW of DSR

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Active • 2018-19 (T-1), 2019-20 (T-1) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (8 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Active • 2017-18 (T-1), 2018-19 (T-1) ...
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (5 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Active • 2017-18 (T-1), 2020-21 (T-4)
Weights Farm,Weights Lane,Redditch,B97 6RG (5 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Active • 2017-18 (T-1), 2020-21 (T-4)
Weeke Down, Lanham Lane, Winchester, SO22 5QL (4 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 35*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Active • 2017-18 (T-1), 2020-21 (T-4)
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)

29MW of DSR

Active • 2020-21 (T-1), 2022-23 (T-3) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (8 components)

19 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-3) ...
16.37 MW
UNIT 5 ALDERMAN WOOD ROAD TANFIELD LEA INDUSTRIAL EST SOUTH TANFIELD LEA STANLEY DH9 9XH (4 components)

Turn down CMU. De-rated volume of 0.313

Active • 2017-18 (TR)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (8 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Active • 2019-20 (T-1), 2020-21 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (5 components)

5 MW of demand reduction

Active • 2019-20 (T-1), 2022-23 (T-4)
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (6 components)

2MW of DSR

Active • 2020-21 (T-1), 2022-23 (T-3) ...
1.72 MW
Trent Basin Nottingham NG2 4DS (5 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Active • 2018-19 (T-1), 2021-22 (T-4)
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (6 components)

1.200MW BESS

Active • 2023-24 (T-1), 2026-27 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2019-20 (T-1), 2021-22 (T-1) ...
Thornham Lane, Emsworth, PO10 8DD (5 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Active • 2017-18 (T-1), 2020-21 (T-4)
These sites are already generating and exporting to the distribution grid. We are aggregating their output in the context of and FFR Growth programme. (7 components)

Different sites with generation increase that already participate in the FFR growth programme

Active • 2016-17 (TR)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (5 components)

0.9MW Battery storage located at Hampshire

Active • 2018-19 (T-1), 2021-22 (T-4)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (12 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Active • 2017-18 (T-1), 2018-19 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (6 components)

0.8MW demand reduction

Active • 2018-19 (T-1), 2021-22 (T-4)
SUBSTATION 2, LITTLEBROOK BATTERY STORAGE, ALBION ROAD, DARTFORD, KENT, DA1 5PZ (7 components)

4MW of DSR

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Stroud Green Lane, Fareham, PO14 2HS (5 components)

40MW of Demand Reduction

Active • 2018-19 (T-1), 2021-22 (T-4)
Stoke Rygby Club, ST15 8TL (1 component)

0.5 MW diesel gensets

Inactive • 2020-21 (T-4)
SOLAR FARM HIGH MEADOW FARM CARLTON VILLAGE CARLTON STOCKTON-ON-TEES DURHAM TS21 1EA (6 components)

Battery with a de-rated capacity of 1.043MW

Active • 2017-18 (T-1)
Loading map...
Showing 25 locations