148 unique locations (894 components) - Page 1 of 6
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (8 components)
4MW of DSR
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (8 components)
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (5 components)
50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets
Weights Farm,Weights Lane,Redditch,B97 6RG (5 components)
4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)
29MW of DSR
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (8 components)
19 MW of demand reduction
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (8 components)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (5 components)
5 MW of demand reduction
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (6 components)
2MW of DSR
Trent Basin Nottingham NG2 4DS (5 components)
A 0.5MW Lithium Ion Battery based in Nottingham
Thornham Lane, Emsworth, PO10 8DD (5 components)
18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …
These sites are already generating and exporting to the distribution grid. We are aggregating their output in the context of and FFR Growth programme. (7 components)
Different sites with generation increase that already participate in the FFR growth programme
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (5 components)
0.9MW Battery storage located at Hampshire
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (12 components)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (6 components)
0.8MW demand reduction
The Energy Centre, The Garage, Media City UK, Broadway, M50 2TG. Ordnance Reference ? SJ801974 (6 components)
1 x 2MW Gas CHP
SUBSTATION 2, LITTLEBROOK BATTERY STORAGE, ALBION ROAD, DARTFORD, KENT, DA1 5PZ (7 components)
4MW of DSR
Stroud Green Lane, Fareham, PO14 2HS (5 components)
40MW of Demand Reduction
SOLAR FARM HIGH MEADOW FARM CARLTON VILLAGE CARLTON STOCKTON-ON-TEES DURHAM TS21 1EA (6 components)
Battery with a de-rated capacity of 1.043MW
Solar Farm High Meadow Farm Carlton Village Carlton Stockton-on-Tees Durham TS21 1EA (5 components)
Demand reduction
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (7 components)
1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (16 components)
8.3MW Gas Turbine installation